Services · Build
Design and build, under one roof.
We design your villa and then build it, so one team owns the drawings, the budget and the site. Where an architect and a contractor are separate parties, the gaps between them turn into weeks and into arguments about whose drawing was wrong, and the owner pays for both.
What this covers
We survey before we quote. That means walking the plot, checking its zoning and permitted use, and looking at access and services, then pricing a design against what we found. It takes longer than sending a rate card, and it is the only way the first number and the final number resemble each other.
- Concept design from your brief, your plot and how you want to live.
- Developed design across architecture, interiors and landscape together.
- The technical set the PBG application rests on, prepared as part of the design rather than after it.
- Construction by one team, to the approved drawings.
- Site supervision, a schedule you can see, and written and photographic progress reports.
- Snagging, handover, and the documentation a future buyer or lender will ask for, including the SLF.
How it works
- Discover
- Your site, budget and brief. We check what the plot allows and flag the risks before any drawing begins, because a risk found now is a decision and a risk found later is a variation order.
- Design
- Architecture, interiors and landscape develop together. You can start in the AI studio and our architects refine it into a set that can actually be built.
- Permit
- The PBG is granted against a compliant design, so the permit documents and the drawings are one body of work rather than two.
- Build
- One construction team executes the approved design, with a clear budget, a schedule and a single point of contact on site.
- Handover
- Finished, snagged and handed over ready to live in, sell or lease, with the paperwork to match.
Read this first
How much does it cost to build a villa in Bali?Published market rates for villa construction in Bali commonly run between roughly USD 600 and USD 1,800 per square metre of built area, and the spread is not marketing noise: it is the difference between local materials with simple detailing and an imported, bespoke specification. The more useful question is what that rate excludes, because the pool, the landscaping, the furniture, the permits and the land are usually outside it, and together they can add half again to the figure a builder first quotes.
Have a plot and a brief?
Tell us where it is and what you want to build. We will tell you what the site is likely to demand before anyone talks about a fee.
Chat on WhatsAppWe do this across Bali.
Eight areas, and they do not build alike. Each page says what the ground, water, access and zoning there do to a budget.
Where we build